
Bike Paths are paved facilities that are physically separated from roadways used by motor vehicles, by space or a physical barrier and designated for bicycle use.
This website uses cookies to enhance usability and provide you with a more personal experience. By using this website, you agree to our use of cookies as explained in our Privacy Policy.
The City of Lincoln has an interactive Bikeway Map app! You may also download a PDF version of the Bikeway map.
The City of Lincoln has many bicycle routes and bicycle lanes throughout the City. The Lincoln Bicycle Map is organized by Class I, Class II, Class III, and Class IV categories. Below are the definitions of each class:

Bike Paths are paved facilities that are physically separated from roadways used by motor vehicles, by space or a physical barrier and designated for bicycle use.

Bike Lanes are lanes on the outside edge of roadways reserved for the exclusive use of bicycles, and designated with special signing and pavement markings.

Bike Routes are roadways recommended for use by bicyclists, and often connect roadways with bike lanes and bike paths. Bike routes are designated with signs and/or shared lane markings (“sharrows”).

Class IV separated bikeways, often referred to as a cycle track or protected bike lanes, are for the exclusive use of bicycles, physically separated from motor traffic with a vertical feature. The separation may include, but is not limited to, grade separation, flexible posts, inflexible barriers, or on-street parking. Separated bikeways can provide for one-way or two-way travel.
The City of Lincoln receives Local Transportation Funds (LTF) from the Placer County Transportation & Planning Agency (PCTPA) on an annual basis, based on City population. Two percent of the LTF funds must be used for bicycle and pedestrian improvements. The annual allotment for bicycle and pedestrian improvements from PCTPA varies, but is in the range of $50,000 per year. The City includes these funds in the annual Capital Improvement Project budget to carry out recommended projects in the City’s Bicycle Transportation Plan, as well as other bicycle and pedestrian needs that may arise.
The project installed Class II Bike Lane between O Street and L Street. It also included pavement reconstruction, construction of ADA ramps, and crosswalks.
The project installed Class II Bike Lane between K Street and I Street. It also included pavement reconstruction, construction of ADA ramps, and crosswalks.
1st Street (Phase 3 of Lincoln Boulevard UPRR)
The project included pavement restoration, construction of ADA ramps, sidewalk, and restriping of existing Class II Bike Lanes on 1st Street between H Street and Lincoln Blvd.

Repave and restripe including Class IV Bike Lane from Moore Road to north of 1st Street. Construction also included ADA ramps and crosswalks.
The project is in its last phase of construction. It includes paving reconstruction, ADA ramp upgrades and triping of Class II Bike Lanes on I Street between 1st Street and 6th Street.
The project installed Class IV Bike and NEV Lanes between Sterling Parkway and south of 1st Street. Bike Lane changes to Class III starting north of 1st Street through McBean Park Drive. The project also included
construction of ADA ramps, and crosswalks.
Moore Road Class 1 Trail Project

Project will install a roundabout on Ferrari Ranch Road at the intersections of Sun City Parkway, and Ingram Parkway. Project will include appropriate bicycles lanes and roadway entrance/exit ramps. Additionally, project will repave Ferrari Ranch Road between Ingram Parkway and McBean Park Drive and will install Class II bike lanes along the corridor.
Install Class II Bike Lanes on 9th Street/H Street between O Street and 7th Street. Install Class II Bike Lanes on J Street between 9th Street and 6th Street.
E. Joiner Parkway/Del Webb Boulevard
Project will install a roundabout in lieu of existing all-way stop sign controlled intersection. Project will include appropriate bicycles lanes and roadway entrance/exit ramps.
Brentford Circle Trail Crossings Project

The project is currently under construction. It includes paved parking lot, playground and picnic area, restroom facility, soccer field, multipurpose court and pedestrian trail which connects to Brentford Nature Reserve Trail on the southern side of the park.
The project is currently under construction. It includes gravel parking lot, playground and picnic areas, restroom facility, soccer field and perimeter pedestrian trail. It will also include striping of new crosswalks and restriping of existing Class II Bike/NEV Lanes on Bella Breeze Drive between Cabra Street and McCullough Street.
Contact Us
City of Lincoln
City Hall
600 6th Street
Lincoln, CA 95648
Phone: 916-434-2400
Email Us
Register or Pay