Lincoln Blvd Phase 2 Construction Update

Print

Lincoln Blvd Phase 2 & 1A

About the Project

Lincoln Boulevard is getting revamped! The Lincoln Boulevard Improvements Project will create a friendlier and safer environment for pedestrians, bicyclists, and Neighborhood Electric Vehicle (NEV) drivers along Lincoln Boulevard, the main street through downtown. The project will be on hold for the summer until the traffic signal poles are delivered and then the street corners including related concrete work will be completed.  Work is expected to resume in October click here for more details.  

Phase 2 includes the following:

  • New curbs, gutters, and sidewalks
  • Bulbout curb returns, including clay tile banding
  • ADA compliant curb ramps
  • Improved streetscape including new trees, landscaping, and irrigation
  • Restriping, removal, and replacement of loop detectors(a loop detector alerts traffic lights to change in the direction you are traveling)
  • New traffic signals
  • Drainage improvements

Click here for Drawings: Lincoln Blvd Phase 2 - Drawings-11x17 (Conform Set)

 Construction Schedule

Start: Late April 2018

End: Late November 2018

  